Our network consists of master switch stack of 2 7210 controllers for redundancy. These manage centralise licensing
We then have over 100 Controllers at seperate sites that all talk to teh Master.
We are currently running 6.4.2.6
we wish to upgrade all contrlooers, totake advantage of teh Clarity component.
What sequence should i upgrade my controllers
Once I upgrade a controller, it no longer commenicates with the master as the OS dont talk to each other.
Do I
- switch master over to standby
- upgrade primary master
- stage upgrades to remote controllers
- cut back to primary master
- upgrade standby master
What sort of user outage can I expect, if any
Is the sequence above sort of ok