What's the recommended procedure for handling a planned power outage with regard to shutting down Aruba switches (we have S2500s and S3500s)? The power outage is scheduled to be a day-long operation, so relying on UPS battery back-up isn't a factor. I'm guessing just a configuration save and back-up is about all that can be done - correct?
Thanks for any information!
Jon Koelker
Oyster River School District