Wireless Access

Reply
Regular Contributor I
Posts: 174
Registered: ‎10-22-2010

Active-Active Redundancy in a master-backup master setup - Question.

Hi, 

 

In a master & backup master setup, is it possible to configure a active-active redundancy?

 

that is having two vrrp instances. one controller being master for an vrrp and other controller being master for another vrrp. Wish to terminate half the AP's on one controller and other half on the other controller. AP's in one controller should fail to the other controller, when one is not available. 

 

 

Aruba Employee
Posts: 148
Registered: ‎11-25-2009

Re: Active-Active Redundancy in a master-backup master setup - Question.

Master-Local with two VRRP should serve the purpose. 

Vinod Kumaar AVM ACMX, ACDX
Principal Network Engineer
Customer Advocacy | Aruba Networks Inc.

Did something you read in the Community solve a problem for you? If so, click "Accept as Solution" in the bottom right hand corner of the post.
Search Airheads
Showing results for 
Search instead for 
Did you mean: