Scenario:
1 location has closed and equipment returned.
1 new location is opening and we will be reusing the IP space and equipment.
I already reprovisioned the APs back to "default" before the old location closed, so I know these will need to be reprovisioned once they are reinstalled.
On the master, I removed the old AP group and recreated for the new office (since Aruba doesn't support/provide a way to rename existing AP group).
Now, dealing with the controller is it better for me to wipe the controller, reconfigure it as master and demote when we open the new location? Or, can I leave the controller as-is, only changing the hostname and location on the existing config?
I've reused controllers before (wiping and reloading as master, then demoting), but this is the first time that we will be reusing the IP space, so I don't know if I can save a few steps. I'll be shipping to site and having a 3rd party do the install, so I just need to make sure it works.