Hi,
In a master & backup master setup, is it possible to configure a active-active redundancy?
that is having two vrrp instances. one controller being master for an vrrp and other controller being master for another vrrp. Wish to terminate half the AP's on one controller and other half on the other controller. AP's in one controller should fail to the other controller, when one is not available.