Hi,
we have a MM network setup and one site wants to go to a standalone config.
for now, the site has 2 MD - cluster config.
I was thinking to move all APs to controller A, remove controller B from the cluster and add the config as a master controller. once this is done, move all APs from A to new master controller B and make controller A as a standby controller.
do I need to think about something else ? what about the licenses, do I need to transfer them from MM to this new master-standby setup ?
Thank you!
------------------------------
ioanf
------------------------------