HI All,
This is my first project on Aruba 5400 series switches. I have to make redundancy (vrrp) between two core switches for my CCTV network access switches. Please find attached both core switches configuration. and the drawing which I have on site.
I can see VRRP Master and Backup but the problem I am facing is whenever I am going to connect both core uplinks to end switches my whole network goes down or not able to communicate. As soon as i am removing on core uplink everything seems fine.
Please check the configuration as I am purely new to Aruba. If possible please share relevant configuration for the same.
Please Note: As per below modules information i also not able to do VSF between two
- HP J9988A 24p 1GbE SFP v3 zl2 Mod
- HP J9988A 24p 1GbE SFP v3 zl2 Mod
- HP J9548A 20p GT / 2P SFP+ v2 zl Mod