Wired Intelligent Edge (Campus Switching and Routing)

Reply
Highlighted
Occasional Contributor II

Switch Stacking

Hi there!

 

We have two 2930M switch configured as stacking. Due to hardware failure of the backup switch (Secondary) we have to replace it. So, now how should I configure the new switch? connect the stack cable to it only? or copy the existing config of the master switch to it ?

Could anyone please advise how the new switch should be configured?

 

Thanks!

Highlighted

Re: Switch Stacking

Please refer to page # 28 of following Airheads session slide:

https://www.slideshare.net/ArubaNetworks/emea-airheads-switch-stacking-arubaos-switch

JayBee
ACDX | ACCX| CCIE (RnS/SP,DC) | ACCP | ACMP | ACSA | ACMA | CWNA | JNCIS | JNCIA
If the provided solution resolves your issue, please mark it as accepted solution to help others.
Search Airheads
cancel
Showing results for 
Search instead for 
Did you mean: