if we have a master SC3 controller(with 512 LAP, PEFNG, RFP). and SC3 local controller(with 512 LAP PEFNG, and RFP).
There are about 560 APs, split between these master and local controller. A new local controller to be introduced in the topology.
With centralized licensing enabled. The master SC3 fails, the APs on the master, can they split and failed-over to the local1 and local2(new) controller. That is the licenses used by the APs in the master SC3 controller, will be released and available in the license pool, for the APs to come up on the local2 controller(during the failover event)?