Hi,
Sorry I know this has been brought up many a time from searching Google, but I'm still not happy with what I've read so far. In essense I am trying to unpick a design that a contractor put in before I took up post.
We have two controllers configured as master/local, two ap system profiles with an LMS IP to each controller with no backup LMS, a HA group configured dual/dual and a VRRP instance on an AP VLAN.
I believe I have a redundancy problem and I have scheduled downtime for Christmas to pull plugs to see what happens. Can anyone tell me if the above redundancy configuration looks correct?
Cheers
Shaun