hello Marcel
Thank you very much for your support in this
Yes i got 2 VMS
both are Stand Alone controllers
it seems i get it to work
Look
i can see both controllers now!!
If click on VM2 Which is my standby i get this error but i guess its correct
On the deployment i need to do Ill configure one controller which will be the VM1 and i wll have another controller which will be the VM2
In my lab i configured the like this
1- VRRP ONLY in my VM1 which is the one that has the config
2- VRRP ONLY in my VM2 which only had a few configuration to access it and to do the VRRP(VLANS, pont configuration, default route and that kind of thing)
3-Configured master redundancy shared key here
then on the folder level on VM1 configured the database syncronization
Then i went to the VM2 and configured at controller level
After that they seems that they syncronized as i didnt need to configure the database syncronization config on VM2(guess you just need to enable this :
On the one that have all the config right??
Im asking this because it seems it worked in my lab in the order i did, and i didnt mess up deleting the config of the controller i wanted to be the master.
i got 3 questions for you
1-How can i be sure that im making the correct controller that has all the config the master and stay with all the config? it is the controller that i click Database syncronization? that will be the one that is picked up as the one that got all the config and will replicate it to the other one?
2-If i install the license on VM1 which is the Master which is acting as the active controller and that one goes down, what happens to the other controller, where do i activate the centralized licensing for this like in the 6.5?
3-Should i configure everything on folder level(except for the configuration i had to do in the begginng to create the VRRP and the redundancy? it just that i didnt create a configuration on folder level for the ports and i don tknow if i should go in there and configure it on the folder for the ports