planning to migrate from a A800 running 3.x to a 3xxx running 6.2. the idea is to take the 3.x config, reconfigure the interface section so the 3xxx will accept it and keep the other profiles, AP groups and such. then disconnect the A800 and connect the 3xxx, i assume the APs will reconnect, upgrade and all will be more or less fine.
- the 3xxx supports 6.2, so no 3xxx without memory upgrade
- ill put controlplane security on accept all first.
- this will cause outage, that is fine, having to do some reprofishioning is also fine.
- fallback plan is just putting the A800 back in
will this work, or am i overlooking something?