I need to do a couple things to my CPPM environment over thanksgiving holiday.
- I want to move them from SAS to SSD – TAC says I should shut the server down when moving, and backup of course
- I want to upgrade from 6.8.1 to 6.8.2 to resolve bug CP-33487
Since I have a three node cluster and the mobility controllers point to a group that list all three CPPM servers and the servers are load balanced. Can I remove a server from the group move/upgrade it then put it back in the group without affecting functionality? I would move the servers one day, verify there are no outstanding issues then upgrade the next.