I need some design validation help, this maybe a specific case, but I would like to know if anyone has tried this, or at least find out how AP 335's work in the backend in regards to the hitless failover between E0 and E1.
Imagine we have 5 floors, and each floor has its own access switch, with a dedicated Vlan.
As I understand it, AP 335's will have one active link, an mGig capable E0, and a 1G E1, and the E1 will be on a standby for a hitless failover.
Questions; should E0 and E1 be in the same subnet?
Basically, if possible I would like to connect E0 of each AP in a particular floor to it's respective switch on the same floor, and preferably connect E1 to a different switch at another floor. This is to achieve a “true” power redundancy in the case of any single floor switch failure.
(e.g., 5th floor switch fails, APs will get power from the 4th floor using their E1, but 4th floor has a different subnet)
So do E0 & E1 have to be in the same subnet?
Best Regards,
Eilbron