We currently have 2 Mobility Master environments here, a production and a stage. In the production I recently upgraded from 8.3.0.12 to 8.5.0.10. In the old 8.3 environment we had 3 controllers, 2 7220 controllers were in a cluster and the 3rd 7210 controller was used for RAPs. Since moving to 8.5 the RAPs are now pointing to the cluster of 2 7220 controllers and everything is working great.
Now I would like to move the 3rd 7210 controller, that now has no APs pointing to it, from the production environment, to the stage environment which currently has 2 Mobility Masters and no controllers. It is also running on the same rev software as the production Mobility Masters.
Is there any written procedure to do this?